- Sheepshead Bites - http://www.sheepsheadbites.com -

Photo: Flooding Destroys Turnstiles, Vending Machines At Subway Stations

Posted By Ned Berke On November 6, 2012 @ 2:30 pm In News & Features | 3 Comments

Wondering why it took an extra day to get service at Sheepshead Bay Road station? It’s partially because flood waters shorted out the electronics in the turnstiles and vending machines.

When we came in via subway to Sheepshead Bay station at around 11:00 a.m. today – the first day that Q service resumed making stops there – an electrician was on the scene making repairs to the turnstiles. It appeared all but one were out of order.

Both vending machines on the Sheepshead Bay Road side were also broken. We suspect it’s the same at the Voorhies exit, but there are booth clerks selling Metrocards and giving directions.

Related posts


Article printed from Sheepshead Bites: http://www.sheepsheadbites.com

URL to article: http://www.sheepsheadbites.com/2012/11/photo-flooding-destroys-turnstiles-vending-machines-at-subway-stations/

URLs in this post:

[1] Q Service Restored To Sheepshead Bay, Brighton Beach; B Service Operating North Of Kings Highway: http://www.sheepsheadbites.com/2012/11/q-service-restored-to-sheepshead-bay-brighton-beach-b-service-operating-north-of-kings-highway/

[2] B Train Service Restored To Brighton Beach!: http://www.sheepsheadbites.com/2012/11/b-train-service-restored-to-brighton-beach/

[3] Q Train Operating Between Kings Highway, Manhattan, Queens (Updated): http://www.sheepsheadbites.com/2012/11/q-train-operating-between-kings-highway-and-downtown-brooklyn/

[4] Q Line Subway Service To Be Restored This Afternoon! (UPDATED): http://www.sheepsheadbites.com/2012/11/q-line-subway-service-to-be-restored-this-afternoon/

Copyright © 2008-2011 Sheepshead Bites. All rights reserved.